Light traffic bridge to Sweden.

NCC Infrastructure Division / AlfaBryggan Ab / Tollare Bro

NC Marine delivered a light traffic bridge of approximately 100 m to Sweden. The challenge or specialty was the requirement (a condition set by the Environmental Board) that the bottom vegetation / bottom should not be disturbed. Thus, the light traffic bridge was designed and installed without bottom anchoring. NC Marine’s fixed quay element solution was to the customer’s liking. Watch a video of the installation by Alfabryggan Ab, a partner in Sweden, at the site.

Current main page>>